ALGAE CONTROL
AMMONIA REMOVAL
ANIMAL WASTE
BIO BUSTER ENZYME
CHEMICALS AND
DETERGENTS CHLORINATED ORGANICS
CHLORINATED ORGANICS
DAIRY, COOKED FOOD AND
BREWING
DAIRY, FOOD EFFLUENT
START UP
EU 5 ODOUR CONTROL
EVERFRESH PORTABLE
TOILET TREATMENT
FAT OIL AND GREASE
DEGRADER RTU
 
FILAMENTOUS GROWTH
AND DOMESTIC SEWAGE
GREASE AND SULPHIDE
CONTROL
HYDROCARBON DEGRADER
PRODUCT RANGE
PULP PAPER FRUIT VEG
PROCESSING
REFINERY & PETROCHEMICAL
REFINERY & PETROCHEMICALS
SEPTIC TANK LIQUID
SEPTIC TANK TREATMENT
SACHETS
ALGAE CONTROL
AMMONIA REMOVAL
BIO BUSTER ENZYME
CHEMICALS AND
DETERGENTS CHLORINATED ORGANICS
CHLORINATED ORGANICS
DAIRY, COOKED FOOD AND
BREWING
DAIRY, FOOD EFFLUENT
START UP
EU 5 ODOUR CONTROL
FAT OIL AND GREASE
DEGRADER RTU
 
FILAMENTOUS GROWTH
AND DOMESTIC SEWAGE
GREASE AND SULPHIDE
CONTROL
PRODUCT RANGE
PULP PAPER FRUIT VEG
PROCESSING
ALGAE CONTROL
AMMONIA REMOVAL
BIO BUSTER ENZYME
CHLORINATED ORGANICS
EU 5 ODOUR CONTROL
EVERFRESH PORTABLE
TOILET TREATMENT
FAT OIL AND GREASE
DEGRADER RTU
 
GREASE AND SULPHIDE
CONTROL
HYDROCARBON DEGRADER
REFINERY & PETROCHEMICAL
REFINERY & PETROCHEMICALS
SEPTIC TANK LIQUID
SEPTIC TANK TREATMENT
SACHETS
ALGAE CONTROL
ANIMAL WASTE
BIO BUSTER ENZYME
FAT OIL AND GREASE
DEGRADER RTU
SEPTIC TANK LIQUID
SEPTIC TANK TREATMENT
SACHETS
   
BIO BUSTER ENZYME
CHLORINATED ORGANICS
HYDROCARBON DEGRADER
REFINERY & PETROCHEMICAL
REFINERY & PETROCHEMICALS
   
 
homepage | enquiry form | sitemap  
Biosystems Europe can help with algae and duckweed control, septic tanks and hydrogen sulphide removal
< Back    printer version  

   Ammonia removal and case study
Hydrogen sulphide removal

CASE HISTORY

Abattoir, Commissioning of Activated Sludge Plant

This abattoir’s ancient activated sludge system needed complete refurbishment requiring the aeration tank to be drained.

A characteristic of the waste water is its consistently very high ammonia concentration.

The activated sludge system has to achieve a final effluent of 20 mg/l BOD, 10 mg/l ammonia and 30 mg/l suspended solids.

The authorities required that this standard be achieved at all times with no concessions for out of spec discharges during re commissioning. To overcome this, during the first few days of the start up process, a proportion of the untreated waste water was tankered away and the plant was re commissioned on a “fill and draw” basis using the final settlement tanks as reservoirs for the partly treated effluents.

Bio-Systems Europe manufactured bacteria products, EU10Startup and EU1000 were the products applied here. These materials were added over 5 days. After three further days the ammonia standard had been achieved. Subsequent BOD and SS analysis demonstrated that these requirements were also being met.

biological commissioning of abattoir - ammonia removal

top ^

 

BIO-SYSTEMS EUROPE
E-mail: sales@biosystemseurope.co.uklogoWeb: www.biosystemseurope.co.uk
Reg. In England No. 1947718

 

 

 

 


 
BIO-SYSTEMS EUROPE
All information Copyright
E-mail: sales@biosystemseurope.co.uk Biosystems EuropeWeb: www.biosystemseurope.co.uk
Reg. In England No. 1947718